Canadian-engineered modular data centres

A data centre should scale like a product, not restart like a project.

Modular data centre infrastructure

Factory-built power, cooling and compute.
Online in months. Built to scale, upgrade and move.

MODR module cutaway with its roof lifted, showing server racks, electrical distribution, cooling pipes, fibre routes and enclosure.
Illustrative product cutaway · project-specific engineering
INSIDE MODR / SIX COORDINATED SYSTEMS

One module. Every system connected.

Compute / DESIGN INTENT

Built around your servers of choice.

Every module starts with the equipment going inside it. The size, weight, power and cooling needs of your racks shape the whole design. Our standard layout holds the racks, and the hardware you choose sets how much computing power fits.

Coordinated scope

  • Rack layout, airflow and room to work
  • Power and cooling hookups for every rack
  • Clear separation of servers, storage and networking
MODR C SERIES / INTERACTIVE ENGINEERING

The anatomy of a MODR module.

From the steel frame to the compute tray. Open the assemblies, trace the systems and cut through the enclosure.

MODR — The Modular InfrastructureC625ENGINEERING STUDIO
14 COMPONENT GROUPS
MODR engineering assembly with separated roof, services, racks and steel frame
Preparing the engineering model

Loading geometry and service assemblies…

EXPLODED ASSEMBLYOriginal MODR concept model
100% separated
100%
10rack positions
14component groups

Assembly opens the physical layers. System paths explain the connections. Section cut reveals what sits behind the enclosure.

C SERIES / CAPACITY LADDER

Find your first block.
See the next one.

Each C Series block is a factory-built unit. Pick the size that fits your phase, then add the next block when you need it. Every block is sized to your workload, equipment and site.

  1. MODR C625: 1 container, 625 kW IT
    625kW ITMODR C625 · 1 container
    The first capacity cell

    MODR C625

    625kW IT
    Containers
    1
    IT per container
    625 kW

    A first deployment, dedicated workload or regional capacity requirement.

    Inspect C625
  2. MODR C1000: 1 container, 1 MW IT
    1MW ITMODR C1000 · 1 container
    The 1 MW container

    MODR C1000

    1MW IT
    Containers
    1
    IT per container
    1,000 kW

    A first production deployment, or two workloads that share one site.

    Inspect C1000
  3. MODR C1500: 1 container, 1.5 MW IT
    1.5MW ITMODR C1500 · 1 container
    The 1.5 MW container

    MODR C1500

    1.5MW IT
    Containers
    1
    IT per container
    1,500 kW

    Regional AI inference, enterprise and sovereign capacity.

    Inspect C1500
  4. MODR C2000: 1 container, 2 MW IT
    2MW ITMODR C2000 · 1 container
    The 2 MW container

    MODR C2000

    2MW IT
    Containers
    1
    IT per container
    2,000 kW

    AI and HPC clusters, and colocation phases.

    Inspect C2000
  5. MODR C3000: 1 container, 3 MW IT
    3MW ITMODR C3000 · 1 container
    The 3 MW container

    MODR C3000

    3MW IT
    Containers
    1
    IT per container
    3,000 kW

    AI and HPC, colocation and phased campus development.

    Inspect C3000
Reference configuration · engineering review required
Requirements
→
Interfaces frozen
→
Factory accepted
→
Set + connected
→
Commissioned capacity
Status quo

The site should not be the first place everything comes together.

When services clash, installed work must change. Crews redo connections, equipment waits, and the programme moves while the site catches up.

  1. 01 / Redesign

    Services clash.

    A large service blocks the cable route. The packages cannot connect as planned.

  2. 02 / Rework

    Installed work changes.

    Installed sections come back down while the next trade waits for access.

  3. 03 / Delay

    Delivery outpaces the site.

    Equipment has arrived. Unfinished site connections prevent installation.

Conventional site / illustrative scenario

The future

From approved specifications to connected infrastructure.

The module follows one governed path. Site foundations, utilities and network preparation run in parallel and converge at installation.

  1. 01

    Design finalised

    Approved drawings, specifications, equipment schedules and structural, electrical, thermal and controls interfaces are released for manufacture.

    Design released
  2. 02

    Factory build

    The module is fabricated, equipped, wired, piped, integrated and verified in a controlled production environment.

    Factory test accepted
  3. 03

    Load out

    The completed module is protected, lifted, positioned and restrained on its project-specific trailer.

    Load secured
  4. 04

    Transport

    Route, permits, escorts, site access and delivery timing are coordinated as one controlled movement.

    Delivered to site
Parallel site track
Civil + foundations
Power + utilities
Fibre + security
Converges at installation

Every infrastructure family becomes a configurable MODR module.

Project requirements change. The interfaces and deployment logic stay disciplined.

  • The white space, productized.

    Rack, containment and facility interfaces configured for modern densities and liquid-ready architectures.

    • Rack + containment
    • Busway distribution
    • Liquid-ready interfaces
  • A repeatable electrical spine.

    Factory-integrated power blocks from medium-voltage intake through UPS, batteries and low-voltage distribution.

    • MV / LV distribution
    • UPS + battery systems
    • Skid or enclosure formats
  • Heat leaves on a system plan.

    Coordinated heat-transfer, pumping, CDU and rejection systems for high-density compute loads.

    • CDU + pumping
    • Dry / hybrid rejection
    • Warm-water architectures
  • Every module joins one fabric.

    Carrier, meet-me, network and security infrastructure connected through a common campus architecture.

    • Carrier + meet-me
    • Campus fabric
    • Security zoning
  • One operational language.

    Common instrumentation and supervisory interfaces across equipment, modules and the complete campus.

    • BMS / EPMS
    • DCIM integration
    • Remote operations ready
  • Operations ship with the system.

    Security, workshop, spares and operational spaces designed inside the same modular discipline.

    • Operations + workshop
    • Storage + spares
    • Security + access

Concept visualizations. Hover or tap a module for details.

Illustrative MODR infrastructure
INTERACTIVE CAMPUS

Explore the complete infrastructure.

The interactive view loads as you approach.

The module moves as finished infrastructure.

Load engineering, route planning, delivery control and site lifting are treated as one coordinated package—not handed off as disconnected logistics.

Illustrative visualization
07 / Load-out

Lift and secure.

Protection, lifting plan, restraint points and trailer configuration are verified before release.

Gate / Load secured
Illustrative visualization
08 / Transport

Control the movement.

Route, permits, escorts, site access and delivery window are coordinated around one arrival plan.

Gate / Delivered to site
Illustrative visualization
09–11 / Site integration

Set, connect, prove.

The module is placed, joined to the prepared spine, site-tested and commissioned as one system.

Gate / Commissioned capacity
Factory acceptanceControlled transportSite commissioningHandover

Less time. Less waste.
More control.

Build and test in the factory while the site takes shape. The objective: a shorter onsite programme, less material waste and lower installed cost.

01 / Time on site
15months

Less time on site.
Built into the plan.

62.5% shorter onsite target

Based on MODR’s 9-month target against a 24-month conventional baseline.

Onsite durationManagement target / months
Conventional baseline24months
MODR target9months
Two workstreams. One delivery plan.

Factory integration and site preparation progress in parallel, then converge at installation.

02 / Material efficiency
40%
MODR
design target

Less waste.
More disciplined production.

Repeatable designs, controlled material use and fewer onsite rework cycles.

MODR target 60Reduction 40

Illustrative waste index · conventional baseline = 100

03 / Installed cost

Control cost
before site work starts.

Designed for lower installed cost, through three repeatable delivery levers.

  1. 01

    Repeat the engineering.

    Standard interfaces reduce redesign between deployments.

  2. 02

    Move assembly into the factory.

    Reduce field labour, repeated mobilization and avoidable rework.

  3. 03

    Buy through repeatable packages.

    Defined equipment schedules give procurement a consistent basis.

Cost outcome is assessed against the project scope and supplier quotations.
Targets, with a clear basis.

The schedule and waste figures are MODR management targets, subject to validation through reference deployments. The schedule comparison covers time on site, not total project lead time. Permitting, utility availability, equipment lead times and site conditions affect the programme. Cost savings are project-specific.

Data centre electricity use is projected to approach 950 TWh by 2030.

1,0007505002500 TWh
2025485
2030950
~2× global data-centre electricity use
950TWh

Projected global data-centre electricity consumption in 2030.

3×AI-focused demand

Projected growth in AI-focused data-centre electricity use from 2025 to 2030.

3%of global electricity

Projected data-centre share of worldwide electricity demand in 2030.

Source: IEA, Key Questions on Energy and AI (2026)
≈97GW added

Projected global capacity growth between 2025 and 2030.

≈200GW global capacity

Potential installed data-centre capacity by 2030.

up to US$7Tinvestment through 2030

Infrastructure, real-estate value and tenant IT fit-out estimated by JLL.

Source: JLL 2026 Global Data Center Outlook

One platform. Different workloads.

01

AI + HPC

Liquid-ready infrastructure for accelerated compute and changing rack densities.

02

Colocation

Repeatable capacity blocks and consistent operating practices across a portfolio.

03

Hyperscale

Compute, power and thermal modules coordinated into campus-scale systems.

04

Sovereign + edge

Packaged infrastructure for controlled, regional or constrained environments.

Define the first capacity block.

Set critical capacity, rack density, resilience, cooling architecture, site conditions and schedule. MODR turns the agreed basis into a coordinated delivery system.

Define a project
Concept visualization / factory verification